Img 2716.jpg?ixlib=rails 2.1

As we near closer to camp, our maintenance crew is working hard to improve our campus facilities.

Again, one of the most frequent pieces of feedback we received from our parents was that bathhouses should be updated. So, thanks our parents’ feedback, we’re working on just that.

Check out these pictures that detail what all is happening at Camp. I’d like to personally thank our Director of Maintenance, Bob Lacher, and our Director of Grounds, Matt Gregory, for all of their hard work; they are making a big difference already for your child’s upcoming summer experience.

We installed new wood interior and shelving in the Long Bathhouse.

We put in new counter tops and mirrors in the Brick Bathhouse.

The Brick Bathhouse showers are getting new tile.

Our swimming pool needed major structural work. We are completely re-plastering, re-bricking, and re-tiling the entire pool. We’ll also run new pipe and lay new concrete down at the end of the project.

We replaced the north wall in the Boys Bathhouse.

New siding was added to the Long Bathhouse.